1, Equipment organization:
Mash and Lauter Tun:
- Type 304 stainless steel;
- Thickness of Tanks: 3mm for interior shell;
- Heat Insulation: High quality PU Foam with thickness range from 60mm to 100mm;
- The outer covering: brushed and polished surface of type 304 stainless steel, with thickness of 2mm;
- Equipping with sparge ring with nozzles, and 360 degree of rotating tank washing ball on top of the tank;
- Use milled sieve plates, which have higher filtration accuracy and better effect;
- The bottom is equipped with a wort collection loop and an under-the-flush device;
- Effective volume: 2BBL Full volume: 2.8BBL;
- Related Inlet and outlet pipe fittings and valves with type 304;
- Thermistor temperature sensor interface on the side of the tun.
Kettle and whirlpool tun:
- Type 304 stainless steel;
- Thickness of Tanks: 3mm for interior shell;
- Heat Insulation: High quality PU Foam with Thickness range from 60mm to 100mm;
- The outer covering: brushed and polished surface of Type 304 stainless steel, with thickness of 2mm;
- Equipped with electric elements for heating;
- Equipped with an exhaust device to avoid too much water vapor in the mashing area, indoor or outdoor type depends on customer needs;
- Equipping with a special inline hop filter to make the wort clearer before fermenting;
- Effective volume: 2BBL Full volume: 2.8BBL
- 360 degree of rotating tank washing ball;
- Related Inlet and outlet pipe fittings and valves with Type 304;
- Thermistor temperature sensor interface on the side of the tun.
Hot water tank:
- Type 304 stainless steel;
- Thickness of Tanks: 3mm for interior shell;
- Heat Insulation: High quality PU Foam with thickness range from 60mm to 100mm;
- The outer covering: brushed and polished surface of type 304 stainless steel, with thickness of 2mm;
- Equiped with electric elements for heating;
- Effective volume: 2BBL Full volume: 2.8BBL
- 360 degree of rotating tank washing ball;
- Related Inlet and outlet pipe fittings and valves with type 304;
- Thermistor temperature sensor interface on the side of the vessel.
2, Main specifications:
| Capacity/Brew | 2BBL |
| Time needed for one brew | 5 hours and consecutive two brews need about 8 hours |
| Installed power | 25kW ~ 28kW |
| Voltage | 3phase/380(220, 415,440…)v/50 (60)HZ
Single Phase/ 220(110, 240…)v/50(60)Hz |
| Heating method | Electric/Steam/Gas fire |
| Area Request | About 20M2 (Basic requirement) |
| Beer can be brew | All kind of craft beer |









Reviews
There are no reviews yet.